@2011 Project:
Client : Leader Civil Engineering Corporation Limited & The Jardine Engineering Corporation Limited
Job Descriptions : Construction of FRP covers, ladders, platforms, staircases, synthetic timber cladding, weirs to Preliminary Treatment Works at North Point, Wan Chai and Central


Advantages :
- Undoubtedly light self-weight
- Rapid installation
- No machinery and plant is requested for assembly
- Extremely versatile and numerous variations
- Minimum labour force is required
- Formwork has a life more than 15-25 cycles
- Zero water absorption
-Unaffected by climate variation and minimum affected by temperature variation
Formworks are manufactured to suit standard, skewed or tapered objects
- Minimizing Cutting
All formwork panels are pre-assembly at factory and numbering for re-assembly
- Minimizing site adjusting and reducing site labour time
The propagation of duplicate formwork sets is relatively short
- No lamination on site manpower
- Allowing large volume concrete casting at one shoot
The laying time of the panel is extremely rapid
- To 5 times faster than steel panel and 10 times faster than timber panel
The lightweight formwork allows panels to be fixed to braced pairs to lifting into place
- cutting down on handling time and providing for a safer working environment whilst placing intermediate panels.
Details are shown on the drawings black-and-white
- No waste time for reporting and arguing.
Shorter possession periods
@2018 Project:
Client : Lee Kei Machinery & Engineering Limited & China Profit Engineering Limited
Job Descriptions : Provision of FRP formwork to the civil consecution works at San Wai Sewage Treatment Works
FRP Formwork has potential to take off to a greater extent in the foreseeable future in the region.
The ease of installation and lightweight nature of the product enable the client to make vast savings in on-site labour due to reductions in handling costs.
Also, as panels are custom built and delivered ready for use no on-site cutting is required.